Installation of the P-25 dual repeater test unit required the addition of a second AC power lightning protection device as indicated above. Radio Site Staff: Larry Gruber, Parks Radio 10 - Rob Lee, DNR Radio 28 - Andy Osborn, DNR Radio 29